移机步骤
移机步骤
Relocation steps
1.确定空调移动的位置,管度的长度是否足够。空调的安放位置是否适合,是否符合各种要求等。空调的重新移机也是需要符合一般安装空调位置的要求的。应该勘察好环境位置是否适合转移空调,再准备好需要的材料和器材。包括制冷修理工具一套,以及室内外机的固定用膨胀螺丝等材料。还有需要更新、延长等的管道等等。
1. Determine the moving position of the air conditioner and whether the
length of the pipe is sufficient. Whether the placement position of the
air conditioner is suitable and meets various requirements, etc. The
relocation of the air conditioner also needs to meet the requirements of
the general installation position of the air conditioner. It is
necessary to investigate whether the environmental location is suitable
for transferring the air conditioner, and then prepare the required
materials and equipment. Including a set of refrigeration repair tools
and expansion screws for fixing indoor and outdoor units. There are also
pipelines that need to be updated, extended, etc.
2.回收制冷剂:把空调器中的制冷剂收集到室外机中去。拆机前应启动空凋器,可用遥控器设定制冷状态,待压缩机运转5-10分钟,制冷状态正常后,用扳手拧下外机的液体管与气体管接口上的保帽,关闭高压管(细)的截止阀门,l分钟后管外表结露,立即关闭低压管(粗)截止阀门,同的迅速关机,拔下电源插头,用扳手拧紧保险帽,至此回收制冷剂工作完成。也可采用室内机上的强制启动按钮开机,同的观察室内、外机是否还有其他故障。
2. Recover refrigerant: collect the refrigerant in the air conditioner
into the outdoor unit. Before dismantling the machine, start the air
conditioner and set the refrigeration state with the remote controller.
After the compressor operates for 5-10 minutes and the refrigeration
state is normal, screw off the protective cap on the interface between
the liquid pipe and the gas pipe of the external machine with a wrench,
close the stop valve of the high-pressure pipe (fine), and immediately
close the stop valve of the low-pressure pipe (coarse) after 1 minute of
condensation on the surface of the pipe. In the same way, shut down
quickly and unplug the power plug, Tighten the safety cap with a wrench,
and the refrigerant recovery is completed. The forced start button on
the indoor unit can also be used to start the machine, and observe
whether there are other faults in the indoor and outdoor units.